, ,

Baramulla-Uri Highway to Remain Closed at Two Stretches on Jan 11

Posted by

Baramulla-Uri Highway to Remain Closed at Two Stretches on Jan 11

The District Magistrate Baramulla has ordered the temporary closure of the Baramulla Uri National Highway at two vulnerable stretches on January 11, 2026 (Sunday), in the interest of public safety.

According to an official order, a copy of which lies with news agency that, the traffic movement will remain suspended at Danakha Mode near Design Chainage 65 plus 600 and at NS Bridge, Uri near Design Chainage 102 plus 800 from 7 am to 5 pm on Sunday.

Best scholarships for J&K students after 12th

The decision, the order says, follows a request from the Officer Commanding, 53 RCC of the General Reserve Engineer Force, who informed the district administration about proposed hill cutting work at the identified locations.

The officer flagged the risk of landslides during execution of the work, citing recent incidents of minor landslips along the same road stretch.

Install our App & get daily FREE Mock Test

The administration noted that the nature of the work and prevailing conditions necessitate temporary restrictions to prevent any loss of life or damage to property.

Best Education Loan Options for J&K Students 

The order directs the Senior Superintendent of Police Baramulla to deploy adequate police personnel at the affected locations. The traffic wing has been instructed to manage diversions through alternate routes and ensure installation of proper barricades at both sites.

Authorities have advised road users to plan their travel accordingly and cooperate with enforcement agencies during the closure period.

 

👉Join JK Updates WhatsApp Channel 👈

5L+ App Installs – Trusted by Lakhs of Users – Install–> AndroidIOS

👉Join Our Telegram Channel

📲 Get Instant Updates on our App
Install